HomeAbout Manufacturing
OverviewChina FactoryCambodia Factory
Products
All ProductsUnderwearSocksBabywearSleepwearSwimwearFabrics & Elastics
Quality
OverviewQuality ControlCertificationsMaterials
SustainabilityPartnershipContact

Established 2015

Cambodia — Cost Efficiency at Scale

DALI's Cambodia operations represent the cost-efficiency pillar of our dual-base strategy. Located in the Phnom Penh Special Economic Zone, our three factories leverage Cambodia's Everything But Arms (EBA) trade status to offer zero-tariff access to all 27 EU member states.

This means our partners save 6–12% on EU tariff costs compared to sourcing from other Asian manufacturing hubs. Combined with our vertically integrated supply chain from China, this creates a unique competitive advantage.

With 2,700+ skilled sewing operators, modern Juki and Brother industrial machines, and full ERP monitoring, we deliver the same DALI quality at a more competitive cost point.

DALI Cambodia factory floor

Capacity

Factory Specifications

FactoryLines/MachinesMonthly OutputWorkersArea
Factory I35 lines6.5M pcs9809,096 m²
Factory II45 lines8.5M pcs1,2009,500 m²
Factory V (Socks)700 machines3.0M pairs5208,000 m²
Total80 lines + 70015M + 3M pairs2,700+26,596 m²

Technology

Modern Equipment & Systems

  • Fully automatic spreading & cutting machines
  • Juki & Brother industrial sewing machines
  • 2,700+ skilled sewing operators
  • ERP-monitored production with 100% traceability
  • Real-time production tracking
  • In-line quality control at every station
  • AQL 1.0-2.5 final inspection standard
Automated cutting machines
DALI new Cambodia production campus

Future

New Production Campus 2026-2027

Our largest-ever expansion is underway in Phnom Penh SEZ — a 36,000 m² facility that will increase our total Cambodia capacity to over 30 million pieces monthly.

  • Factory Area: 36,000 m²
  • Building Area: 30,000 m²
  • Production Lines: 30 lines + 1,000 sock machines
  • Planned Workforce: 2,000+
  • Target Capacity: 6.0M pcs + 4.0M pairs/month
  • LABS Certified (Life & Building Safety)
  • Solar + Storage sustainable energy

Timeline: Q2 2026 Construction Complete → Q3 2026 Production Begins → Q1 2027 Full Operation

3

Factories

80

Production Lines

2,700+

Skilled Workers

15M

Pieces Monthly

DALI warehouse

Save 6-12% with EBA Duty-Free Production

Contact us to learn how Cambodia sourcing can reduce your EU tariff costs.

Request a Quote